byway Talk to us →
03Warehousing · BTS

We don’t find you a warehouse. We build it.

Land, design, construction and lease under one agreement. Column spacing set to your racking, clear height set to your stacking, dock count set to your throughput — on zoned, pre-cleared land near your consumption centres. We fund and build it, so a purpose-built facility never sits on your balance sheet.

Model
Build · Develop · Lease
Designed around
Your racking
Land
Zoned, pre-cleared
Stage
Land.
Floor area
0 sq ft
Clear height
0 m
Dock doors
0
Truck court
45 m
Land
Setting out
Structure
Envelope
Docks
Live
04Built to your operation

Your racking plan.
Our column grid.

A standard shed is a compromise you pay for every day it operates. A metre of wasted aisle, a column in the wrong place, one dock short at peak — these do not show up in the rent, they show up in the throughput. So the drawing starts from your pallet, not from a shed we happen to own.

01

Land, zoned and ready

We hold and develop land in industrial zones near consumption centres and highway corridors, so approvals, power and connectivity are settled before design starts.

02

Designed around the pallet

Column spacing, clear height and dock count are set by your racking layout and throughput, not by a standard drawing. The building fits the operation, not the other way round.

03

Built, then leased

We fund and construct the facility and lease it to you long term. You get a purpose-built building without the capital sitting on your balance sheet.

05How it runs

From empty land
to first dispatch.

01

Requirement

Your racking plan, pallet positions, throughput and vehicle mix. We size the building from those numbers, not from a floor-area figure.

02

Site & approvals

Zoned land selected against your lane map, with title, land use, power and access cleared before anything is drawn.

03

Design freeze

Grid, clear height, floor loading, dock count and court depth agreed with your operations team and signed off.

04

Construction

We fund and build it. Progress is reported against the dispatch date you need, not against a construction calendar.

05

Fit-out

Racking, dock levellers, lighting, fire system and office block installed so the building is handed over ready to load.

06

Handover & lease

A long-term lease on a building made for you. One agreement covering land, construction and occupation.

07

Go live

First inbound, first put-away, first dispatch — with our team on site through the ramp-up.

08

Expansion

Sites are planned with a phase-two footprint, so growth is an extension rather than a relocation.

06The specification

The numbers
you actually operate in.

Column grid
12 × 24 mset by your racking layout
Clear height
12 mset by your stacking plan
Floor loading
5 T / m²
Dock doors
24counted against throughput
Truck court
45 msized to your largest vehicle
Model
Build · Develop · Lease

No capital locked up

We carry the land and the construction cost. You take a lease, not a loan, and the warehouse stays off your balance sheet.

Sized once, correctly

Because the grid comes from your racking plan, you are not paying rent on aisles you cannot use or losing pallet positions to a column in the wrong place.

One agreement

Land, approvals, design, construction and lease under a single contract with one accountable party. No developer, broker and contractor pointing at each other.

07Where we fit

Worth a conversation
or worth skipping.

Right for

  • Long-horizon requirements — you know this operation is still running in ten years
  • Anyone whose throughput is limited by the building rather than the team
  • Operations with a specific racking, cold-chain or automation plan a ready shed cannot hold
  • Networks entering a new region who want the building and the lease from one party

Not right for

  • Space needed next month — a build takes time, and a ready warehouse is the right answer
  • Short or uncertain tenure, where a lease on existing space carries less risk
  • Small footprints where a purpose-built facility will not pay for itself
  • Anyone who wants to own the asset — our model is build, develop and lease
Next stop04Enterprise Full Load→